Client: PT. West Point Terminal
Country: Indonesia
Project Location: Pulau Jandaberiad
BMT delivered ship-handling simulations to determine the impact of the marine environment on different types of vessels arriving and departing from the Sinopec West Point terminal in Indonesia.
The simulations were carried out via BMT’s proprietary desktop simulator, BMT REMBRANDT, using simulated hydrodynamic currents of the area.
Scope of work for the simulation was as follows:
BMT was appointed by Technip Geoproduction to carry out Conceptual Engineering Studies for a MOLF for Petroliam National Berhad (PETRONAS). The MOLF was required to be built in order to receive and offload EPCC Contractor's construction goods and project cargo during construction phase of Refinery And Petrochemical Integrated Development (RAPID) project.
Supporting safe growth and infrastructure planning in one of the world's busiest waterways, 2004 - 2020
Blue Dolphin MFV-R, next-generation Marine Fire & Rescue Vessel, designed by BMT and built by Penguin Shipyard International is a 38-metre aluminium mono-hull vessel developed for the Singapore Civil Defence Force (SCDF).
35m Marine Rescue Vessel - NG1037