We were engaged to prepare designs to more than double the output of an existing barge loading facility. The facility handles a number of different grades of coal to deliver a specified blend to each barge.
We have been providing engineering support to Muhibbah Engineering Bhd for the LNG Regasification Facilities Project, commencing from FEED for the LNG regas unit and the Island berth.
Singapore's JTC Corporation, in collaboration with the Safety and Risk Management Safety Centre (SRMC) conducted a series of pilot Quantitative Risk Assessment studies to establish the applicability of the new QRA guidelines in the local context. BMT has been invited by JTC and SRMC to bid for the pilot study using new QRA guidelines on an existing manufacturing facility in Singapore.
We were invited by a global financing and development institution to conduct a cumulative risk assessment of its three major industrial facilities in Nansha, Pearl River Delta and to review its industrial hazard risk management system.
Together with Samsung C&T Corporation and Anatara Koh Pte Ltd, we provided offshore engineering consultancy and construction services for the Singapore LNG terminal secondary and tertiary berths at Jurong Island.