Client: Confidential
Country: Hong Kong
Project Location: Southwest Tsing Yi Island
BMT conducted a marine navigation simulations related to feasibility of developing CT10, a proposed new container terminal, at south west Tsing Yi Island with regards to navigation safety and ship-handling.
The simulations were done on BMT’s proprietary desktop simulator, PC Rembrandt, using simulated hydrodynamic currents of the area.
Scope of work for the simulation was as follows:
We were commissioned by Puma Energy to conduct a HAZOP Study to review the FEED safety design for the current North Vietnam Bitumen Terminal.
We delivered tender design services to Daelim Industrial Co. Ltd
Adani Abbot Point Terminal Pty Ltd acquired the existing Abbot Point Export Terminal.
We were appointed by Vopak Yang Pu, Hainan Storage Terminal to provide consultancy services on all matters relating to the marine facilities for the terminal development.