Client: Confidential
Country: Hong Kong
Project Location: Southwest Tsing Yi Island
BMT conducted a marine navigation simulations related to feasibility of developing CT10, a proposed new container terminal, at south west Tsing Yi Island with regards to navigation safety and ship-handling.
The simulations were done on BMT’s proprietary desktop simulator, PC Rembrandt, using simulated hydrodynamic currents of the area.
Scope of work for the simulation was as follows:
We were commissioned by Puma Energy to conduct a HAZOP Study to review the FEED safety design for the current North Vietnam Bitumen Terminal.
We delivered tender design services to Daelim Industrial Co. Ltd
BMT's Engineering Solutions enhance safety, performance, and operational life for MV Africa Mercy.
BMT was appointed by Technics Oil & Gas Ltd. to conduct a mooring analysis for an 80m LOA vessel and advice on the maximum ship size which can berth at the wharf.