Ports North completed an Environmental Impact Statement (EIS) investigating channel improvements in late 2012 in accordance with the Terms of Reference set out by both the State and Federal Governments. During the course of the EIS, changes including the Federal Government’s regulation on sea disposal and the Queensland Government’s Sustainable Ports Development Act 2015 impacted the EIS outcomes.
We were engaged to provide specialist engineering and environmental inputs for the EIS process and design of a dredge material containment pond (reclamation area). The Cairns Shipping Development project involved the deepening and widening of the entrance channel and basin at the Port of Cairns to accommodate large cruise vessels. This involved dredging approximately 800,000 cubic metres of material which was pumped to the onshore dredge material placement area. Some of the dredged material, particularly the stiff clays, were beneficially reused as surcharge material on the land and incorporated into future land developments. Impacts to the Great Barrier Reef Marine Park in the vicinity was monitored and managed by avoiding marine placement there.
We provided technical expertise in the area of dredging and reclamation design as part of the Cairns Shipping Development revised EIS. The extent of dredging and reclamation design works included the following:
Building on the Port of Cairns Cruise Shipping Demand Study undertaken by us in 2010 – 2011, we are working with project partner Arup to prepare an Environmental Impact Statement for the Port of Cairns Shipping Development Project.
BMT provided Tender Design Services in support of the Phase 2 development of Jurong Shipyard, an integrated facility at Tuas South Singapore.
SkyPier at Hong Kong International Airport provides speedy ferry service for transfer passengers. We were responsible for the ferry pontoons that act as the principal interface for passengers and baggage.
We prepared a business plan for the new offshore multi-user port development in Abu Dhabi, involving staged construction of facilities from initial operations in 2010 to full development by 2028.