We carried out a fit-for-purpose technical due diligence of an existing bulk chemical storage terminal in Batangas, Philippines. The customer sought out our specialists to identify the risks, uncertainties and the potential cost/liability exposure of the terminal and the cost of the associated mitigations.
A project risk management system was developed by us to provide a framework for technical due diligence activities including the assessments of the design, construction and operation of the facilities.
These include:
A project risk register was produced at the end of the assessment to prioritise risk management actions.
Appropriate risk control measures and associated cost estimates were identified to eliminate or reduce all intolerable risks to a level that is acceptable. Through the implementation of a systematic project risk management process, a number of consequential benefits were realised. These include:
We were appointed to prepare the layout of two jetties at its Petroleum Storage Terminal at Banyan Basin, Singapore.
In view of changes made to Singapore QRA Guidelines (implemented in 2016), a Dutch storage major with a brown-field facility whereby the risk from the facility has not been assessed engaged BMT to carry out a Quantitative Risk Assessment (QRA) in accordance to both existing and new Singapore QRA Guidelines for the Terminal.
We have been providing engineering support to Muhibbah Engineering Bhd for the LNG Regasification Facilities Project, commencing from FEED for the LNG regas unit and the Island berth.
We developed the front end of engineering design and invitation to bid package for the upgrading of the existing jetty and construction of a new jetty at PT Pertamina oil storage terminal.